South Main Street, Nance Road to Nowlin Road
Description, Purpose and Benefit of the project: This is a safety and operational roadway improvement project consisting of constructing new turn lanes at various intersections throughout the corridor, some road widening, stormwater improvements, power relocates, striping, improved signage and intersection signaling improvements at both Nance and Blue Springs Road.
The project also includes sidewalk improvements on both the north and south side of from Nance Road to Nowlin. Cobb water and Sewer improvements are included throughout the project. These improvements also take into account construction of the new county library at the corner of South Main St. and Blue Springs Rd. Construction duration is approximately 18 months. The total length of the project is 1.54 miles.
For more information contact Cobb Department of Transportation, the administrator for this contract @ (770) 528-1600.